
MEGA 500/630kW BESS PCS for Peak Shaving
MEGA 500kW and 630kW bidirectional power conversion systems for commercial and grid-level battery energy storage. The range supports multi-unit parallel operation, grid black start, SVG functionality and IEC 61850 communication for project-specific integration.
| Brand | NOVASUN |
|---|---|
| BMS Communication | RS485, CAN |
| Power Range | 500kW / 630kW |
| Type | PCS |
| Max. Efficiency | 98.7% |
| Warranty | 5 years |
Product Description
The MEGA PCS controls power conversion between the battery and the AC system. A complete BESS also needs a battery sized for the required energy capacity, system controls and site protection. Choose the PCS and battery together around the site’s operating requirements.
Compare MEGA 500kW and 630kW PCS models
| Model | PCS power rating | Equipment type |
|---|---|---|
| PCS0500 | 500 kW | Bidirectional power conversion system |
| PCS0630 | 630 kW | Bidirectional power conversion system |
These are the two power ratings shown for this product. Confirm the selected model’s DC voltage and current limits, grid requirements and battery compatibility before specifying the equipment.
Planning a BESS for peak shaving
PCS power in kW and battery energy in kWh answer different questions. The PCS rating sets the power conversion capacity; the battery must be sized separately for the discharge period and usable energy required. A 500kW PCS rating, by itself, does not specify how long a battery system will run.
Start with interval load data and the site’s electricity tariff. Identify the demand peaks to reduce, their duration and when the battery can recharge. The control strategy, available battery energy and grid import or export limits all affect the final design. Our commercial BESS sizing guide explains how to work through power, energy and runtime.
What to confirm before choosing a PCS
Provide the site grid voltage and frequency, proposed battery voltage range and BMS interface, target charge and discharge power, operating schedule and a single-line diagram. Review parallel operation, protection and control requirements as part of the complete system design. For the wider project, see our commercial and industrial energy system solution.
MEGA PCS Product Range

Application Scenarios

Application Examples



Start an Inquiry
Tell us your target PCS power, battery capacity, grid requirements, operating strategy and delivery market. Our team will configure a suitable MEGA 500kW or 630kW BESS solution.

